News from The SUMMIT Companies

SUMMIT conducts multiple asbestos surveys for Carolina Medical Center

Upstate Carolina Medical Center, in Gaffney, SC, hires SUMMIT to conduct multiple asbestos surveys for upcoming renovations in the cafeteria and lobby.

Rock Hill Law Center hires SUMMIT Engineering

SUMMIT Engineering will complete the Geotechnical Engineering and Drilling for the Future Law Center Expansion in Rock Hill, SC.

Woodfield Investments works with SUMMIT on new Mulit-family project in South Charlotte

SUMMIT will perform the Geotechnical, Construction Material Testing and Special Inspections for Woodfield Whitehall Apartments at Aarowood in Charlotte, NC.  SUMMIT will be working with The Housing Studio, Design Resource Group, and CF Evans on this 280368 sq ft, 298 Unit Multi-family project.

Colonial Grand at South End begins working with SUMMIT Engineering

SUMMIT was hired to perform Geotechnical, Construction Materials Testing and Special Inspections for Colonial Grand at South End, a 340 unit apartment complex in a growing part of South Boulevard in Charlotte, NC.  SUMMIT will be working with Design Resource group on this project.

SUMMIT hired for Asbestos Inspection at CPCC

SUMMIT was recently awarded the Asbestos Inspection, Project Design, Abatement Oversight and Air Monitoring at Central Piedmont Community College-Van Avery Building. The Van Avery Building is a 3 story 100,000 square foot building on the downtown campus in Charlotte, NC.

SUMMIT hires Jason Coble, P.E. in Raleigh

Jason Coble, P.E. joins SUMMIT Engineering with over 9 years experience in Civil Engineeringand Geotechnical Engineering practices including transportation engineering, construction material testing, special inspections, project management, and getotechnical engineering. Mr. Coble has a BS Civil Engineering with a Concentration in Geotechnical Engineering from North Carolina State University and will be working in SUMMIT’s Raleigh office.

SUMMIT awarded work at Bexley at Regent Park

SUMMIT was awarded the engineering design, construction layout, as-builts, record platting, materials testing and special inspections for 33 single family homes and 100 townhomes in Fort Mill, SC. SUMMIT is working with B&C Holdings.

Carolinas Healthcare hires SUMMIT for Materials Testing and Inspections

SUMMIT was selected to perform Materials Testing and Special Inspections for the Carolinas Healthcare Sardis Oaks Nursing Facility Expansion.

SUMMIT to work with Crescent Resources at Senator Royall Mixed Use Development

SUMMIT was selected by Crescent Resources to perform Environmental Engineering and Land Surveying for the proposed Senator Royall Mixed-Use Development in Charlotte, North Carolina. .

SUMMIT starts work at Innovation Park, North Parking Deck

SUMMIT has started work including Geotechnical Engineering, Materials Testing and Chapter 17 Special Inspections on the North Parking Deck at the Innovation Park project in north Charlotte. The new 4 level parking structure will provide much needed parking space and ease of access to the recently renovated former IBM facility. BECO is the project developer and Choate Construction is the project GC.

Engineering · Laboratory · Surveying